Description
This report presents key observations, data, findings, and results from visual and sediment monitoring surveys conducted during the laying of a cable from Rhode Island to Block Island in support of the Block Island Wind Farm (BIWF) Project. The results indicated that there was no measurable sediment plume created during the laying of the cable.
Award Amount
USD: $2,525,000
Funding
Type
award
Funder
U.S. Department of the Interior, Bureau of Ocean Energy Management, Environmental Studies Program
Funder ID
https://doi.org/10.13039/100012475
Award Dates
2016-05-12 → 2017-01-01
Award Number
M15PC00002, M16PD00011
DOI / Resource
Field Xml File
100130.xml
(2.16 KB)
- ROR:https://ror.org/03tzscr25Series Title:BOEM Environmental StudiesISSN:3071-6349Report Title:Observing Cable Laying and Particle Settlement During the Construction of the Block Island Wind FarmAuthors:JB Elliot, K Smith, DR Gallien, AA KhanPublication Year:2017Publisher:U.S. Department of the Interior, Bureau of Ocean Energy Management, Environmental Studies ProgramPlace:Washington D.C.Report Number:BOEM 2017-027Contract #:M15PC00002, M16PD00011Award DOI:10.67297/9A1DA2Report DOI:10.67297/01873EField Xml File100158.xml (2.64 KB)
- ROR:https://ror.org/03tzscr25Series Title:BOEM Environmental StudiesISSN:3071-6349Report Title:Observing Cable Laying and Particle Settlement During the Construction of the Block Island Wind FarmAuthors:Elliot James B., Smith Kevin, Gallien Dennis R., Khan and Anwar A.Publication Year:2017Publisher:U.S. Department of the Interior, Bureau of Ocean Energy Management, Environmental Studies ProgramPlace:Washington D.C.Report Number:BOEM 2017-027Contract #:M15PC00002, M16PD00011Award DOI:10.67297/9A1DA2Report DOI:10.67297/0187ABField Xml File100267.xml (2.66 KB)