Sediment Sorting During Coastal Restoration Projects: Implications for Resource Management, Environmental Impacts, and Multiple Use Conflicts

Description
Beach nourishment projects using sand mined from offshore borrow sites must often meet sediment compatibility requirements including sediment size, sediment sorting, mineral content, sediment color, and fine sediment content. In many instances, the application of these regulations does not account for changes in these sediment characteristics from borrow areas to beach placement sites. Hopper dredging operations for beach and nearshore placement typically include periods of overflow at the borrow site and outwash at the beach, which changes the fine sediment content and color of sand ultimately placed on the beach compared to that of the borrow area. This study measured and compared sediment characteristics at the borrow area, in the dredge hopper, and on the beach to determine changes in sediment composition and characteristics associated with specific dredging operations. The study found that 87% of the fine sediment content of the borrow site sediments was removed in the process of dredging and beach placement. The dredging process reduced the fine sediment content and lightened the color of the sediment placed on the beach, two important factors for determining sediment compatibility with the native beach. This report recommends the application of simple, data-based estimates of fine-sediment removal to ensure compatibility of offshore sands with the receiving beaches.
Award Amount
USD: $400,000
Funding
Type
award
Funder
U.S. Department of the Interior, Bureau of Ocean Energy Management, Environmental Studies Program
Funder ID
https://doi.org/10.13039/100012475
Award Dates
2016-07-26 → 2019-02-15
Award Number
M16PG00023
DOI / Resource
DOI
Resource
https://boem.gov/awardpages/100173
Field Xml File
100173.xml (3.23 KB)
  • ROR:https://ror.org/03tzscr25
    Series Title:BOEM Environmental Studies
    ISSN:3071-6349
    Report Title:Sediment sorting during hopper dredging and pumpout operations
    Authors:SJ Smith, AM Priestas, DB Bryant, KE Brutsché, KA Fall
    Publication Year:2019
    Publisher:U.S. Department of the Interior, Bureau of Ocean Energy Management, Environmental Studies Program
    Place:Washington D.C.
    Report Number:BOEM 2019-010
    Contract #:M16PG00023
    Award DOI:10.67297/9A1DCD
    Report DOI:10.67297/0187E1
    Field Xml File
    100321.xml (3.11 KB)