Real-time Opportunity for Development Environmental Observations (RODEO); Task 7: Monitor Seafloor Disturbance

Description
Benthic and epifouling monitoring was conducted within the BIWF Project area for four consecutive years (2016 to 2019) after turbine installation. Three rounds of sampling and laboratory analyses were conducted with samples collected at Turbines 1, 3, and 5. Results indicated that within four years the submerged sections of the BIWF jacket foundation structures became dominated by mussels (Mytilus edulis) and associated species, and that significant modification of the seabed has occurred within the footprint of the turbine foundations, with the area underneath Turbine 1 exhibiting the fastest rate of change.
Award Amount
USD: $1,421,186
Funding
Type
contract
Funder
U.S. Department of the Interior, Bureau of Ocean Energy Management, Environmental Studies Program
Funder ID
https://doi.org/10.13039/100012475
Award Dates
2017-06-26 → 2019-07-31
Award Number
M17PD00015
DOI / Resource
DOI
Resource
https://boem.gov/awardpages/100227
Field Xml File
100227.xml (2.39 KB)
  • ROR:https://ror.org/03tzscr25
    Series Title:BOEM Environmental Studies
    ISSN:3071-6349
    Report Title:Seafloor disturbance and recovery monitoring at the Block Island wind farm, Rhode Island; Summary report
    Authors:
    Publication Year:2020
    Publisher:U.S. Department of the Interior, Bureau of Ocean Energy Management, Environmental Studies Program
    Place:Washington D.C.
    Report Number:BOEM 2020-019
    Contract #:M17PD00015
    Award DOI:10.67297/9A1E03
    Report DOI:10.67297/01AF6A
    Field Xml File
    110442.xml (2.17 KB)
  • ROR:https://ror.org/03tzscr25
    Series Title:BOEM Environmental Studies
    ISSN:3071-6349
    Report Title:Benthic and epifaunal monitoring during wind turbine installation and operation at the Block Island Wind Farm, Rhode Island; project report
    Authors:
    Publication Year:2020
    Publisher:U.S. Department of the Interior, Bureau of Ocean Energy Management, Environmental Studies Program
    Place:Washington D.C.
    Report Number:BOEM 2020-044
    Contract #:M17PD00015
    Award DOI:10.67297/9A1E03
    Report DOI:10.67297/01B045
    Field Xml File
    110661.xml (2.58 KB)
  • ROR:https://ror.org/03tzscr25
    Series Title:BOEM Environmental Studies
    ISSN:3071-6349
    Report Title:Benthic and epifaunal monitoring during wind turbine installation and operation at the Block Island Wind Farm, Rhode Island; Volume 2 Appendices
    Authors:Z Hutchison, ML Bartley, P English, J King, S Grace, B Kresning, C Baxter, K Ampela, M Deakos, A Khan
    Publication Year:2020
    Publisher:U.S. Department of the Interior, Bureau of Ocean Energy Management, Environmental Studies Program
    Place:Washington D.C.
    Report Number:BOEM 2020-044
    Contract #:M17PD00015
    Award DOI:10.67297/9A1E03
    Report DOI:10.67297/01B046
    Field Xml File
    110662.xml (3.48 KB)