The most recent Construction and Operations Plan (COP) and appendices, updated March 2023, are available below. For more information on the proposed project, visit the Revolution Wind project page.
Volume I - COP
Appendices:
B - Coastal Zone Management Act Consistency Certifications
C1 - Certified Verification Agent – Scope of Work (CONFIDENTIAL)
C2 - Certified Verification Agent – Statement of Qualification (CONFIDENTIAL)
D - Emergency Response Plan/Oil Spill Response Plan (CONFIDENTIAL)
E - Safety Management System (CONFIDENTIAL)
F - Preliminary Cable Burial Feasibility Assessment (CONFIDENTIAL)
G - MEC/UXO Risk Assessment with Risk Mitigation Strategy (CONFIDENTIAL)
H - Supplemental Project Information and Conceptual Project Engineering Design Drawings (CONFIDENTIAL)
I - Foundation Feasibility Study (CONFIDENTIAL)
J - Hydrodynamic and Sediment Transport Modeling Report
K - Onshore Natural Resources and Biological Assessment
L - Essential Fish Habitat Assessment
M - Marine Archaeological Resources Assessment (CONFIDENTIAL)
N - Terrestrial Archaeological Resources Assessment (CONFIDENTIAL)
O1 - Revolution Wind Integrated Geotechnical and Geophysical Site Characterization Study (CONFIDENTIAL)
O2 - Revolution Wind 2017-2020 Geophysical Surveys, Data Acquisition and Processing Report (CONFIDENTIAL)
O3 - Field Operations and Final Results Report Revolution Wind Export Cable Route Geotechnical Investigation (CONFIDENTIAL)
O4 - Measured and Derived Geotechnical Parameters and Final Results: REV01 GT1BInter Array Cable and Export Cable Route (IAC/ECR) Locations (CONFIDENTIAL)
O5 - Measured and Derived Geotechnical Parameters and Final Results : REV01 GT1B Wind Turbine Generator and Offshore Substation (WTG/OSS) Locations (CONFIDENTIAL)
O6 - Preliminary Field Results Report: REV01 Inter-Array Cable and Export Cable Route (IAC/ECR) Locations (CONFIDENTIAL)
O7 - Preliminary Field Results Report: REV01 Offshore Substation (OSS) Locations (CONFIDENTIAL)
O8 - Preliminary Field Results Report: REV01 GT1B Wind Turbine Generator (WTG) Locations (CONFIDENTIAL)
P1 - Offshore Airborne Sound Assessment
P2 - Onshore Acoustic Assessment
P3 - Underwater Acoustic Modeling Analysis
P4 - Underwater Acoustic Modeling of Detonations of Unexploded Ordnance (UXO)
Q1 - Offshore Electric- and Magnetic- Field Assessment
Q2 - Onshore Electric- and Magnetic- Field Assessment
R - Navigation Safety Risk Assessment
S1 - Obstruction Evaluation and Airspace Analysis
S2 - Radar and Navigational Aid Screening Study
S3 - Air Traffic Flow Analysis
S4 - Aircraft Detection Lighting System Efficacy Analysis
T - Air Emissions Calculations and Methodology (CONFIDENTIAL)
U1 - Visual Impact Assessment and Historic Resources Visual Effects Analysis - Revolution Wind Onshore Facilities (CONFIDENTIAL)
U2 - Historic Resources Visual Effects Analysis - Revolution Wind Farm (CONFIDENTIAL)
U3 - Visual Impact Assessment - Revolution Wind Farm
V - Phase 1 Environmental Site Assessment (CONFIDENTIAL)
W - Metocean Report (CONFIDENTIAL)
Y - Fisheries and Benthic Monitoring Plan
Z1 - Assessment of Impacts to Marine Mammals, Sea Turtles, and ESA-Listed Fish Species
Z3 - Protected Species Mitigation and Monitoring Plan (PSMMP): Marine Mammals
AA - Assessment of the Potential Effects of the Revolution Offshore Wind Farm on Birds and Bats
BB - Cultural Resources Avoidance, Minimization, and Mitigation Measures (CONFIDENTIAL)
CC - Assessment of the Economic Development Benefits of the Proposed Revolution Wind Project (CONFIDENTIAL)