Revolution Wind Farm Construction and Operations Plan

The most recent Construction and Operations Plan (COP) and appendices, updated March 2023, are available below. For more information on the proposed project, visit the Revolution Wind project page.

Volume I - COP

Appendices:

A - Agency Correspondence

B - Coastal Zone Management Act Consistency Certifications

C1 - Certified Verification Agent – Scope of Work (CONFIDENTIAL)

C2 - Certified Verification Agent – Statement of Qualification (CONFIDENTIAL)

D - Emergency Response Plan/Oil Spill Response Plan (CONFIDENTIAL)

E - Safety Management System (CONFIDENTIAL)

F - Preliminary Cable Burial Feasibility Assessment (CONFIDENTIAL) 

G - MEC/UXO Risk Assessment with Risk Mitigation Strategy (CONFIDENTIAL)

H - Supplemental Project Information and Conceptual Project Engineering Design Drawings (CONFIDENTIAL)

I - Foundation Feasibility Study (CONFIDENTIAL)

J  - Hydrodynamic and Sediment Transport Modeling Report

K  - Onshore Natural Resources and Biological Assessment

L  - Essential Fish Habitat Assessment

M - Marine Archaeological Resources Assessment (CONFIDENTIAL)

N - Terrestrial Archaeological Resources Assessment (CONFIDENTIAL)

O1 - Revolution Wind Integrated Geotechnical and Geophysical Site Characterization Study (CONFIDENTIAL)

O2 - Revolution Wind 2017-2020 Geophysical Surveys, Data Acquisition and Processing Report (CONFIDENTIAL)

O3 - Field Operations and Final Results Report Revolution Wind Export Cable Route Geotechnical Investigation (CONFIDENTIAL)

O4 - Measured and Derived Geotechnical Parameters and Final Results: REV01 GT1BInter Array Cable and Export Cable Route (IAC/ECR) Locations (CONFIDENTIAL)

O5 - Measured and Derived Geotechnical Parameters and Final Results : REV01 GT1B Wind Turbine Generator and Offshore Substation (WTG/OSS) Locations  (CONFIDENTIAL)

O6 - Preliminary Field Results Report: REV01 Inter-Array Cable and Export Cable Route (IAC/ECR) Locations (CONFIDENTIAL)

O7 - Preliminary Field Results Report: REV01 Offshore Substation (OSS) Locations (CONFIDENTIAL)

O8 - Preliminary Field Results Report: REV01 GT1B Wind Turbine Generator (WTG) Locations (CONFIDENTIAL)

P1 - Offshore Airborne Sound Assessment

P2 - Onshore Acoustic Assessment

P3 - Underwater Acoustic Modeling Analysis

P4 - Underwater Acoustic Modeling of Detonations of Unexploded Ordnance (UXO)

Q1 - Offshore Electric- and Magnetic- Field Assessment

Q2 - Onshore Electric- and Magnetic- Field Assessment

R - Navigation Safety Risk Assessment

S1 - Obstruction Evaluation and Airspace Analysis

S2 - Radar and Navigational Aid Screening Study

S3 - Air Traffic Flow Analysis

S4 - Aircraft Detection Lighting System Efficacy Analysis

T - Air Emissions Calculations and Methodology (CONFIDENTIAL)

U1 - Visual Impact Assessment and Historic Resources Visual Effects Analysis -  Revolution Wind Onshore Facilities (CONFIDENTIAL)

U2 - Historic Resources Visual Effects Analysis - Revolution Wind Farm (CONFIDENTIAL)

U3 - Visual Impact Assessment - Revolution Wind Farm 

V - Phase 1 Environmental Site Assessment (CONFIDENTIAL)

W - Metocean Report (CONFIDENTIAL)

X1 - Benthic Assessment

X2 - Habitat Mapping Report

Y - Fisheries and Benthic Monitoring Plan

Z1 - Assessment of Impacts to Marine Mammals, Sea Turtles, and ESA-Listed Fish Species

Z2 - Protected Species Mitigation and Monitoring Plan (PSMMP): Sea Turtles and ESA-Listed Fish Species

Z3 - Protected Species Mitigation and Monitoring Plan (PSMMP): Marine Mammals

AA - Assessment of the Potential Effects of the Revolution Offshore Wind Farm on Birds and Bats

BB - Cultural Resources Avoidance, Minimization, and Mitigation Measures (CONFIDENTIAL)

CC - Assessment of the Economic Development Benefits of the Proposed Revolution Wind Project (CONFIDENTIAL)

DD - Commercial and Recreational Fisheries

EE - Fisheries Communication and Outreach Plan