Construction and Operations Plan for Lease OCS-A 0498 (Last updated April 2023)
- Volume I: Project Information
- Volume II: Affected Environment
- Volume III: Appendices
- Appendix A – Emergency Response Plan, Including Oil Spill Response Plan (Confidential)
- Appendix B – Safety Management System (Confidential)
- Appendix C – Certified Verification Agent Services (Confidential)
- Appendix D – Marine Site Investigation Report (Confidential)
- Appendix E – Biological Survey Results
- Appendix F – Archaeology and Historic Properties Survey Report (Confidential)
- F-1 Maritime Archaeological Resources Assessment (MARA) (Confidential)
- F-2 Terrestrial Archaeological Resource Assessment (TARA) (Confidential)
- F-3 Assessment of Visual Effects on Onshore Historic Properties (HRVEA) (Confidential)
- HRVEA Non-Technical Summary
- HRVEA Part 1 of 2
- HRVEA Part 2 of 2
- HRVEA Non-Technical Summary
- F-4 Historic Properties Treatment Plans
- F-5 Terrestrial Unanticipated Discoveries Plan, Marine (Submerged) Unanticipated Discoveries Plan
- Appendix G – Locations for Offshore Turbines and Substations
- Appendix H – Assessment of the Potential Effects of the Ocean Wind Offshore Wind Farm on Birds and Bats
- Appendix I – Atlantic Sturgeon Supplementary Material
- Appendix J – Marine Mammal Supplementary Material
- Appendix K – Sea Turtle Supplementary Material
- Appendix L-VIA
- Appendix M (Part 1): Navigation Safety Risk Assessment
- Appendix M (Part 2): Navigation Safety Risk Assessment
- Appendix N – Air Quality Analysis (Confidential)
- Appendix O – Fisheries Communication and Outreach Plan
- Appendix P – Technical Information in Support of EFH Consultation
- Appendix Q – Coastal Zone Consistency Assessment
- Appendix R - Noise Supplementary Material
- R-1 Over-air Noise Supplementary Material
- R-2 Underwater Noise Supplementary Material
- Appendix S – BOEM’s Best Management Practices
- Appendix T – Departure Requests (Confidential)
- Appendix U – Conceptual Plans and Typical Design Drawings
- Appendix V – Environmental Justice Supplementary Material
- Appendix W – Metocean Monitoring Information
- Appendix X – Munitions and Explosives of Concern (MEC) and Unexploded Ordnance (UXO) Supplemental Information (Confidential)
- X-1 Munitions and Explosives of Concern (MEC) and Unexploded Ordnance (UXO) with Risk Assessment and Risk Mitigation Strategy
- X-2 MEC Pre-Installation Geophysical Survey Specification
- Appendix Y – Site Conditions Assessment (Confidential)
- Appendix Z – Design Feasibility Study (Confidential)
- Appendix AA – Protected Species Mitigation and Monitoring Plan (PSMMP)
- Appendix AB – Avian and Bat Post-Construction Monitoring Framework
- Appendix AC – Wetland Delineation Report
- File 1 of 3 – Oyster Creek Wetland and Watercourse Delineation Report
- File 2 of 3 – Photologs for Oyster Creek and BL England
- File 3 of 3 – Supplemental Wetland Reports
- Appendix AD – Airspace and Radar Analysis
- Appendix AE – Fisheries Mitigation Efforts